MIDC Fire Department Services
Ensuring Safety Compliance with Every Spark — From Planning to Final Clearance
Fire safety is a legal and moral obligation for every industrial and commercial development. Under the Maharashtra Fire Prevention and Life Safety Measures Act, all MIDC-approved structures must obtain fire safety clearances at different stages of the construction lifecycle. From provisional design compliance to final on-ground inspections, every step must meet stringent fire norms aligned with structural plans.
At DharmaSetu Goldschmidt Advisory, we guide clients through every requirement of the MIDC Fire Department — ensuring every application, inspection, and renewal is handled with full accuracy and respect for procedural integrity.

Our MIDC Fire Department Services
Final Fire NOC
This certificate is mandatory before applying for a Building Completion Certificate (BCC).
- Verify adherence to all conditions stated in the provisional Fire NOC
- Coordinate with MIDC Fire Department for on-site safety inspection
- Ensure compliance with fire exits, extinguishing systems, signage, and hydrant installations
- Manage file movement and documentation till Final Fire NOC issuance
Renewal of Fire NOC
Fire NOCs have limited validity and must be renewed periodically to maintain compliance.
- Monitor Fire NOC expiry dates for proactive renewal management
- Coordinate fire safety re-inspection with MIDC authorities
- Update documentation reflecting changes in occupancy, layout, or equipment
- Submit and track renewal request to avoid operational disruptions
Fire Layout Compliance Support
We support architects and engineers in preparing plans that align with fire department expectations.
- Validate fire exits, emergency signage, hydrant points, and sprinkler system design
- Ensure compliance with height, FSI, occupancy load, and building usage norms
- Coordinate pre-approval of layout from Fire NOC desk at MIDC
- Prevent redesign or delays by ensuring compliance at planning stage
Provisional Fire NOC Advisory
While not officially listed, most projects begin with a provisional assessment of fire readiness.
- Assist in the initial submission of fire safety plans via AutoDCR
- Liaise for technical clarifications on approved drawings and fire strategies
- Facilitate provisional endorsement before physical construction begins
- Build a compliance trail that accelerates Final NOC issuance

Why Work with DharmaSetu Goldschmidt Advisory?
- Hands-on experience with fire clearances for factories, logistics parks, warehouses, IT parks, and multi-story units
- Direct coordination with MIDC Fire Officers, Chief Fire Engineers, and local station authorities
- Integration of Fire NOC processing into broader BCC, SPA, and lease compliance timelines
- Pre-inspection checklists and documentation readiness built into every case
- Compliance-first approach that protects your project, your people, and your peace of mind
Need Fire Clearance for Your MIDC Project?
Let us take the heat off — with disciplined documentation, precise inspections, and timely approvals.