Skip to content

One Tap MIDC Services

End-to-End Support for Industrial Growth in Maharashtra’s Premier Industrial Ecosystem

One Tap MIDC Services

At DharmaSetu Goldschmidt Advisory, we specialize in navigating the Maharashtra Industrial Development Corporation (MIDC) system — offering end-to-end solutions for companies looking to establish or expand operations across Maharashtra’s industrial belts.

From land acquisition and layout planning to engineering utilities, drainage, and regulatory clearances, our MIDC Services simplify the most complex processes with precision, speed, and strategic insight.

We work hand-in-hand with MIDC’s departments, helping you:
• Identify the right industrial zone
• Secure land or built-up units
• Obtain all necessary clearances and permissions
• Navigate lease documentation and compliance procedures
• Leverage available subsidies and incentive schemes

Whether you’re setting up a new unit or managing post-allotment modifications, our team ensures you get it done — with no delays, no confusion, and no missed opportunities.

Our MIDC Sub-Services at a Glance

Land Department Services

Helping you manage everything from lease documentation to activity change and subdivision approvals.

Predetermined Lease

Execute a MIDC-sanctioned lease required to avail project financing prior to BCC.

Final Lease

Formalize land ownership rights post-BCC with MIDC’s final lease execution.

Plot Amalgamation

Merge two or more plots into a single unit for expanded usage or improved FSI planning.

Time Limit Extension for Obtaining BCC (Occupancy Certificate)

Obtain official extensions from MIDC when construction delays prevent timely OC/BCC submissions.

Plot Subdivision

Split your existing plot into smaller, independent parcels based on business needs or joint ventures.

Change in Activity

Get approvals to modify your industrial activity while staying compliant with zoning norms.

Change in Land Use

Facilitate transition from Industrial to Commercial usage (or vice versa) with MIDC consent.

Mortgage Consent

Secure MIDC’s permission to mortgage the allotted plot, including tripartite agreement coordination.

Surrender of Plot

Navigate surrender protocols compliantly to avoid penalties or recovery charges.

Plot Subletting/Sub-Leasing

Obtain MIDC permission to lease or sublet a portion of your plot to third parties.

Change in Company Name

Update MIDC records following a legal name change of your business entity.

Plot Transfer

Facilitate a formal change in plot ownership with MIDC through premium payments and documentation.

Duplicate Allotment Order

Apply for reissuance of allotment orders in case of loss or misplacement.

Engineering - Water Department Services

Get utility approvals with speed and transparency.

No-Dues Certificate

Obtain proof from MIDC that all utility payments are cleared for your water connection.

Change in Water Supply Connection Size

Upgrade or downgrade your water connection based on current consumption requirements.

Consumer Name Change

Update the registered consumer name on MIDC water records following internal business changes.

Water Meter Testing

Ensure meter calibration and accuracy for fair billing and compliance.

Engineering - Drainage Department Services

Ensure proper sewage connectivity and MIDC compliance for waste management infrastructure.

Engineering - Power Department Services

Secure power infrastructure permissions and upgrades for your industrial unit.

SPA (Special Planning Authority) Department Services

All construction-related approvals handled under MIDC’s SPA framework.

Occupancy Certificate (OC)

Get official approval to occupy and operate your constructed facility post-BCC.

Application for Stacking of Building Material & Debris

Secure short-term permissions to store construction material within your premises or open areas.

Combined Building Plan Approval

Get construction plans sanctioned via MIDC’s AutoDCR platform, covering architectural and structural details.

Tree Felling / Trimming / Replantation

Obtain environment clearance to manage on-site green cover in line with MIDC guidelines.

Plinth Completion Intimation

Mandatory reporting of construction up to plinth level to MIDC.

e-Intimation for Commencement of Work

Notify MIDC before physical construction begins on-site.

Right of Way (RoW)

Apply for RoW permissions across MIDC utility corridors or service lanes to facilitate infrastructure work.

Why Work with DharmaSetu Goldschmidt Advisory?

  • Direct experience across all MIDC zones and departments
  • Structured, pre-vetted documentation for faster approvals
  • Dedicated team for engineering, legal, and planning coordination
  • End-to-end tracking of applications with real-time client updates
  • Policy-aligned advisory that unlocks incentives and prevents project risk

Need a Trusted Partner to Handle Your MIDC Clearances?

Start strong. Stay compliant. Scale confidently.