MIDC Engineering Department Services
Enabling Industrial Infrastructure Through Water, Power & Utility Compliance
No industrial project can begin operations without assured access to utilities like water and electricity, and no utility can be legally connected without MIDC Engineering Department approval. Every connection, change in infrastructure, or clearance for service setup requires formal applications, engineering verification, and departmental clearance under MIDC’s regulatory framework.
At DharmaSetu Goldschmidt Advisory, we help businesses seamlessly obtain and manage water supply, power access, and utility-related no-dues certifications — with complete procedural compliance and uninterrupted execution.

Our MIDC Engineering Department Services
New Water Connection
We support clients in obtaining new industrial-grade water connections from MIDC.
- Draft and submit application along with water demand estimation
- Assist in execution of Water Agreement with MIDC
- Coordinate inspection and connection point allocation with engineering staff
- Follow through until official water line activation and metering setup
Change in Size of Water Connection
Industries often need to increase or reduce their water intake — both require formal approval.
- Assess operational water requirement and prepare revised demand report
- Liaise with MIDC for hydraulic feasibility and availability
- Modify Water Agreement based on new size category
- Oversee pipe infrastructure update and MIDC billing adjustments
No Dues Certificate (Water & Engineering Charges)
A No Dues Certificate is essential before transferring, mortgaging, or modifying plot status.
- Check outstanding water usage, development, and maintenance dues
- Facilitate settlement of pending amounts and formal acknowledgment
- Prepare and submit request letter to MIDC Engineering Division
- Secure official No Dues Certificate from MIDC, including endorsement from Finance and Engineering
NOC for Power Connection
MIDC issues an NOC required to obtain electricity supply from MSEDCL or private DISCOMs.
- Assist in preparing electrical load analysis and connection requirement
- Liaise with MIDC to secure NOC for transformer, substation, or direct feeder setups
- Integrate fire clearance and civil drawings with MIDC engineering expectations
- Follow up for joint inspection and final NOC grant

Why Work with DharmaSetu Goldschmidt Advisory?
- Technical liaisons with experience in water/power policy interpretation, pipeline design, and engineering workflows
- Seamless integration with lease, SPA, and fire departments for utility-linked compliance
- Coordination with MIDC’s zonal engineers, billing departments, and MSEDCL counterparts
- Timely submission and close tracking of all site inspections, agreements, and dues processing
- Support for startups to large-format industries seeking efficiency with full utility readiness
Need Utility Approvals for Your MIDC Plot?
We’ll help you connect the lines — legally, efficiently, and without disruption.